Post-Installed Concrete Anchor Selection and Review
Review post-installed concrete anchor layouts, manufacturer data and installation conditions with a worked anchor-reaction example.
Inputs and Prerequisites
Attachment geometry, tension and shear actions, substrate information, and current product and installation documentation.
Design and Review Workflow
- Connection actions
- Anchor group
- Concrete substrate
- Installation checks
- Record the actions at the attachment and any load eccentricity.
- Verify concrete condition, edge distance, anchor spacing and embedment against the applicable design basis and product scope.
- Review installation requirements and identify field checks that affect acceptance.
Worked Example for a Centered Anchor Group
A hypothetical centered 12 kN service tension acts through a rigid plate with four identical anchors. With equal stiffness, uniform engagement and no applied moment, the initial equilibrium check gives 3 kN per anchor. Eccentricity or plate deformation can change the distribution.
Output Checks and Common Errors
Check all relevant failure modes using the governing design basis and verified product data. Record the substrate, installation method and inspection criteria.
Official References
- Hilti specifications and CAD details
Open the anchor and rebar section to locate installation details for the selected system.
Related Calculation Workbooks
- Historical Adhesive Rebar Embedment Tables
Reference tables for HY-200 and RE-500 based on stated PROFIS Rebar assumptions.
- Anchor Rod Plate Washer Dimensions
Organizes plate washer sizing for anchor rods.
- Canadian Column Base Plate Design
Provides two historical base-plate design layouts, for a bearing cap or a footing or slab.
- Base Plate Anchor Bolts (Two Cases)
A two-case layout for anchor bolts under base-plate tension and shear.
- Anchor Bolt Tension and Shear
Organizes anchor bolt inputs for one tension and shear load case.