Advanced

Comparing Deep Floor Deck Span Options

Record the intended stage and shoring for each span. Use the example below to practice the review and record an output that another reviewer can reproduce.

Inputs and Prerequisites

Exact deck designation, number of spans, proposed clear spans and current manufacturer tables.

Review Workflow

  1. Deck series
  2. Bay continuity
  3. Table row
  4. Exceptions
  1. Record the intended stage and shoring for each span.
  2. Read the exact series and gauge row.
  3. Recheck an end bay if the interior bay assumes continuity.

Worked Example

A schematic layout has two interior spans of 4.5 m and a single end span of 3.7 m with a break in continuity. Enter the 3.7 m bay on the single-span sheet and the 4.5 m bays on the applicable continuity sheet instead of screening by longest span alone.

Output Checks and Common Errors

Reject a row if profile, gauge or shoring assumptions differ. Exercise spans imply no product rating.

Official References