Intermediate

Matching Through-Penetrations to Firestop Listings

Record substrate, penetrant, dimensions and required rating. Use the example below to practice the review and record an output that another reviewer can reproduce.

Standpipe passing through a concrete floor with firestop around the opening
Standpipe Penetration by Achim Hering (public domain)

Inputs and Prerequisites

Rated assembly detail, penetrating service data and a current listing.

Review Workflow

  1. Rated assembly
  2. Penetrant
  3. Measured clearance
  4. System listing
  1. Record substrate, penetrant, dimensions and required rating.
  2. Compute the nominal annular space and check whether centering is assumed.
  3. Compare the complete field configuration with the listed arrangement.

Worked Example

A centered 70 mm pipe through a 110 mm hole leaves 20 mm nominal annular space. A 7 mm center offset makes the clear space about 13 mm on one side and 27 mm on the other. Compare both extremes with the actual listing.

Output Checks and Common Errors

Verify the full listing, including packing and spacing, and coordinate the structural opening separately.

Official References

Related Video

How To Read UL Listings for Penetration Firestop Systems (YouTube)