Advanced

Existing Floor Loading and Capacity Assessment

Build an evidence record for evaluating an existing floor under proposed equipment or use.

Inputs and Prerequisites

Existing drawings and site observations; proposed load footprint and movement paths; materials and applicable design basis.

Work Steps

  1. Inputs
  2. Model or detail
  3. Independent check
  4. Review record
  1. Record the floor system, supports and confidence in each source.
  2. Map permanent, concentrated and moving loads to their footprints.
  3. Identify the distinct global and local checks and the missing information needed to assess them.

Worked Example or Review Exercise

A hypothetical 12 kN load over 0.6 m² averages 20 kPa over that footprint. Keep the contact geometry for local checks; averaging over the full room would lose the localized demand.

Output Checks and Common Errors

Separate a screening calculation from a verified capacity assessment. Check construction deviations and local effects near supports and openings.

Official References