Intermediate

Reviewing Pipe Guides, Stops and Supports

Create a movement schedule for each support. Use the example below to practice the review and record an output that another reviewer can reproduce.

Inputs and Prerequisites

Piping isometric, support tags, axis convention and a movement range from the piping team.

Review Workflow

  1. Pipe axes
  2. Support function
  3. Travel check
  4. Reaction handoff
  1. Create a movement schedule for each support.
  2. Assign slide, guide and stop directions by local axis.
  3. Compare cold and operating positions with physical clearances.

Worked Example

A pipe centerline is expected to move 18 mm in the positive longitudinal direction. A stop gap of 25 mm leaves 7 mm in the nominal sketch. If the as-installed gap can be 8 mm smaller, contact is possible in that tolerance case.

Output Checks and Common Errors

Ask the piping team to confirm sign, reference temperature and load cases before passing actions to structural supports.

Official References