Intermediate

Pipe Supports and Hangers

Read a piping support schedule and pass the right reactions and restraint information to structural review.

Inputs and Prerequisites

Piping layout and reactions; operating and installation states; restraint, travel and attachment details.

Work Steps

  1. Inputs
  2. Model or detail
  3. Independent check
  4. Review record
  1. Identify which directions the support restrains or allows to move.
  2. Separate operating, testing and other provided reaction cases.
  3. Trace each force through the hanger, bracket or rail to the supporting structure.

Worked Example or Review Exercise

Given a hypothetical vertical reaction of 5 kN and a separate longitudinal reaction of 2 kN, keep their directions and case provenance with the coordinate sketch before combining effects.

Output Checks and Common Errors

Compare support tags, axis conventions and load case names with the piping model. Check clearances through the stated movement range.

Official References