Advanced

Retaining Wall Load Path and Foundation Checks

Connect earth and water assumptions to wall and foundation checks.

Inputs and Prerequisites

Wall geometry; geotechnical recommendations; backfill, groundwater and surcharge assumptions.

Work Steps

  1. Inputs
  2. Model or detail
  3. Independent check
  4. Review record
  1. Record soil, water and surcharge conditions with their sources.
  2. Resolve the loads and their application levels.
  3. Review the wall section, base and supporting soil as one load path.

Worked Example or Review Exercise

For an assumed triangular lateral pressure diagram, the resultant acts one-third of the loaded height above its base. Verify the chosen pressure diagram against the applicable geotechnical basis.

Output Checks and Common Errors

Confirm drainage assumptions and check forces at the base before evaluating stability or resistance.

Official References