Advanced

Checking BIM Information Against a Model Exchange Need

List geometric and nongeometric information required for each purpose. Use the example below to practice the review and record an output that another reviewer can reproduce.

Inputs and Prerequisites

Project modeling requirements, intended use and an element-level deliverable matrix.

Review Workflow

  1. Project use
  2. Element requirements
  3. Sample audit
  4. Gap list
  1. List geometric and nongeometric information required for each purpose.
  2. Check sample elements against the agreed deliverable.
  3. Record unresolved information separately from model appearance.

Worked Example

A coordination package has 24 steel beams with location and section, but only 20 have verified connection geometry. If the receiving task requires connections on all 24, mark four information gaps even though every beam is visible.

Output Checks and Common Errors

Use the project agreement and named intended uses to assess completeness.

Official References

Related Video

BIMForum Global LOD Specification: How to Use It (YouTube)