Intermediate

Roof Snow Loads and Snow Drift

Build a roof load map with climate data, roof geometry and the adopted code basis.

Inputs and Prerequisites

Roof plan and elevations; adopted code edition; location-specific snow and associated rain inputs.

Work Steps

  1. Inputs
  2. Model or detail
  3. Independent check
  4. Review record
  1. Identify upper and lower roofs, steps and obstructions.
  2. Record each climate input and coefficient’s source.
  3. Separate uniform roof load from localized drift cases and assign the correct loaded area.

Worked Example or Review Exercise

The Linkoteq NBCC 2020 uniform benchmark uses 2.40 kPa ground snow, 0.40 kPa associated rain and a 0.80 basic roof factor, with the remaining stated factors at 1.00. The example gives 2.32 kPa. Draw a separate load diagram for any drift case required by the project.

Output Checks and Common Errors

Compare total loads and reactions to a hand estimate for the uniform case. Check whether roof steps or obstructions also require a drift case.