Finding the Governing Anchor Evaluation Report
Locate the current evaluation record by model or report number. Use the example below to practice the review and record an output that another reviewer can reproduce.
Inputs and Prerequisites
Exact anchor marking, supplier product code, base material and jurisdiction.
Review Workflow
- Model marking
- Evaluation record
- Substrate scope
- Decision log
- Locate the current evaluation record by model or report number.
- Check covered substrates and installation limits.
- Attach the relevant revision and record any mismatches.
Worked Example
A hypothetical fastener submittal relies on a report covering solid concrete while the opening detail places it into hollow masonry. Log the mismatch and keep the design check open until the application is supported.
Output Checks and Common Errors
Check edition, jurisdiction and product variant. A US evaluation report may require separate acceptance in a Canadian project.
Official References
- ICC-ES report directory
Find the current report for the exact product and configuration.