Building a Repeatable Structural Condition Survey
Write observations with location, dimension and date. Use the example below to practice the review and record an output that another reviewer can reproduce.
Inputs and Prerequisites
Member identifiers, access plan, marked survey points and a repeatable measurement method.
Review Workflow
- Member ID
- Observation
- Repeat location
- Follow-up
- Write observations with location, dimension and date.
- Separate observations from diagnosis.
- Assign follow-up based on uncertainty and potential consequence.
Worked Example
An assumed survey finds 5 observations across 18 inspected bays; 2 are at the same recurring detail. Record both the 5 observations and the recurring cluster, plus which bays were inaccessible. A future revisit uses the original identifiers.
Output Checks and Common Errors
Use consistent coverage and evidence quality before drawing trend conclusions.
Official References
- ACI concrete repair resources
Identify applicable resources for investigation and repair of existing concrete.
Related Video
Structural Concrete Repair Webinar for Building Officials (YouTube)